Problem 12.10: You are called to evaluate a cooling tower

From Chapter 12 Problem Set. Level 3: Optimization.

Question

You are called to evaluate a cooling tower that is consuming significantly more makeup water than expected. The conductivity controller is functioning and holding tower conductivity at 2,400 µS/cm. Makeup conductivity is 600 µS/cm. Based on the calculated cycles, the makeup meter shows water consumption approximately 30% higher than the mass balance predicts. Identify at least three possible explanations for the discrepancy and describe how you would investigate each one.

Answer